Buy 2 get 1 free. Everything is calculated at checkout.

Managing Design Conversations, Project Controls, and Best Practices for Commercial Design and Construction Projects by Michael LeFevre

$47.99

Buy 2, get 1 free. Applied automatically at checkout.

Before you buy

  • Check your email at checkoutYour download link is sent to the address you enter, so make sure it's typed correctly.
  • This is a digital PDFNothing is shipped. The download link arrives by email right after payment.
  • 30-day money-back guaranteeIf the file doesn't work, we'll replace it or refund you.
Can't find the ebook you want?

Send us a photo of the cover in live chat and we'll look for it. We usually reply within 10 minutes.

About this book

Offers state-of-the-art principles and strategies gleaned from high-profile projects to help readers manage design

This guide to managing design process within the commercial design and construction industry addresses a growing pain point in an industry where collaborative approaches to project delivery are outpacing the way professionals work. It synthesizes issues by investigating the “why,” “how,” and “who” of the discipline of managing design, and gives the “what” and “when” to apply the solutions given various project delivery and contracting methods. The book features candid interviews with over 40 industry leaders—architects, engineers, contractors, owners, educators, technology evangelists, and authors—which present a broad look at current issues and offer paths to future collaboration and change.

Managing Design: Conversations, Project Controls and Best Practices for Commercial Design and Construction Projects is a self-help book for design and construction that provides aninsider’s look at the mysteries of managing design for yourself, team, firm and future. It tackles client empathy; firm culture; owner leadership; design and budgets; dealing with engineers, consultants, and contractors; contracts; team assembly; and much more.

  • Features eye-opening interviews with 40 industry luminaries
  • Exposes issues and poses solutions to longstanding industry ills
  • Offers a project design controls framework and toolset for immediate application and action
  • Includes best practice tips, process diagrams, and comparative analytical tables to support the text

Written in a relatable style, Managing Design: Conversations, Project Controls and Best Practices for Commercial Design and Construction Projects is a welcome resource for owners, contractors, and designers in search of better ways to work together.

“Managing Design blends practical advice from the author's five decades in architecture and construction with wisdom from more than three dozen luminaries in the design, delivery, ownership and operation of the built environment. The result is an extraordinary guide to integrating practice across disciplines.”

—Bob Fisher, Editor-In-Chief, Design Intelligence

“Managing Design peers into the soul of a contentious industry as it grapples with change—a deep dive into the design and construction process in the words of those doing the work. I enjoyed the engineers and contractors’ pleas to be made parties to design process early on. The questions—as interesting as the answers—are both here in this book.”

—Richard Korman, Deputy Editor, Engineering News Record

“Managing Design hits many of the design and construction industry’s ills head-on with insightful interviews by new and established leaders and real-world tactics on creating better teams, better communications between players, and—most vitally—better project results.”

—Rebecca W. E. Edmunds, AIA, Editor, Author and President, r4 llc

Book details

Format
PDF, instant download
Language
English

Why buy here

Instant

The PDF is delivered as soon as your payment clears, day or night.

Complete

The full edition, every chapter, no missing pages.

24/7

Questions about your order? Message us in live chat any time.

Secure

Encrypted checkout with all major cards and wallets.

You may also like